[{"activity_id":"16","discipline_id":"2","activity_code":"BLD-010","activity_name":"Site Layout & Setting Out","description":"Building layout and grid setting","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"10","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"17","discipline_id":"2","activity_code":"BLD-020","activity_name":"Excavation - Building","description":"Building foundation excavation","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"20","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"18","discipline_id":"2","activity_code":"BLD-030","activity_name":"Lean Concrete - Building","description":"Lean concrete for building foundation","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"30","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"19","discipline_id":"2","activity_code":"BLD-040","activity_name":"Rebar - Foundation Slab","description":"Reinforcement for foundation slab","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"40","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"20","discipline_id":"2","activity_code":"BLD-050","activity_name":"Formwork - Foundation Slab","description":"Formwork for foundation slab","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"50","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"21","discipline_id":"2","activity_code":"BLD-060","activity_name":"Concrete Pouring - Foundation Slab","description":"Foundation slab concrete pouring","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"60","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"22","discipline_id":"2","activity_code":"BLD-070","activity_name":"Formwork Removal - Foundation","description":"Foundation formwork removal","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"70","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"23","discipline_id":"2","activity_code":"BLD-080","activity_name":"Rebar - Ground Floor Column","description":"Column reinforcement - ground floor","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"80","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"24","discipline_id":"2","activity_code":"BLD-090","activity_name":"Formwork - Ground Floor Column","description":"Column formwork - ground floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"90","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"25","discipline_id":"2","activity_code":"BLD-100","activity_name":"Concrete Pouring - Ground Floor Column","description":"Column concrete - ground floor","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"100","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"26","discipline_id":"2","activity_code":"BLD-110","activity_name":"Rebar - Ground Floor Beam","description":"Beam reinforcement - ground floor","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"110","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"27","discipline_id":"2","activity_code":"BLD-120","activity_name":"Formwork - Ground Floor Beam","description":"Beam formwork - ground floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"120","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"28","discipline_id":"2","activity_code":"BLD-130","activity_name":"Rebar - Ground Floor Slab","description":"Slab reinforcement - ground floor","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"130","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"29","discipline_id":"2","activity_code":"BLD-140","activity_name":"Formwork - Ground Floor Slab","description":"Slab formwork - ground floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"140","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"30","discipline_id":"2","activity_code":"BLD-150","activity_name":"Concrete Pouring - Ground Floor Slab","description":"Slab concrete - ground floor","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"150","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"31","discipline_id":"2","activity_code":"BLD-160","activity_name":"Formwork Removal - Ground Floor","description":"Formwork removal - ground floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"160","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"32","discipline_id":"2","activity_code":"BLD-170","activity_name":"Rebar - 1st Floor Column","description":"Column reinforcement - 1st floor","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"170","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"33","discipline_id":"2","activity_code":"BLD-180","activity_name":"Formwork - 1st Floor Column","description":"Column formwork - 1st floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"180","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"34","discipline_id":"2","activity_code":"BLD-190","activity_name":"Concrete Pouring - 1st Floor Column","description":"Column concrete - 1st floor","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"190","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"35","discipline_id":"2","activity_code":"BLD-200","activity_name":"Rebar - 1st Floor Beam","description":"Beam reinforcement - 1st floor","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"200","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"36","discipline_id":"2","activity_code":"BLD-210","activity_name":"Formwork - 1st Floor Beam","description":"Beam formwork - 1st floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"210","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"37","discipline_id":"2","activity_code":"BLD-220","activity_name":"Rebar - 1st Floor Slab","description":"Slab reinforcement - 1st floor","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"220","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"38","discipline_id":"2","activity_code":"BLD-230","activity_name":"Formwork - 1st Floor Slab","description":"Slab formwork - 1st floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"230","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"39","discipline_id":"2","activity_code":"BLD-240","activity_name":"Concrete Pouring - 1st Floor Slab","description":"Slab concrete - 1st floor","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"240","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"40","discipline_id":"2","activity_code":"BLD-250","activity_name":"Formwork Removal - 1st Floor","description":"Formwork removal - 1st floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"250","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"41","discipline_id":"2","activity_code":"BLD-260","activity_name":"Rebar - Roof Level Column","description":"Column reinforcement - roof level","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"260","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"42","discipline_id":"2","activity_code":"BLD-270","activity_name":"Formwork - Roof Level Column","description":"Column formwork - roof level","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"270","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"43","discipline_id":"2","activity_code":"BLD-280","activity_name":"Concrete Pouring - Roof Level Column","description":"Column concrete - roof level","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"280","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"44","discipline_id":"2","activity_code":"BLD-290","activity_name":"Rebar - Roof Beam","description":"Beam reinforcement - roof","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"290","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"45","discipline_id":"2","activity_code":"BLD-300","activity_name":"Formwork - Roof Beam","description":"Beam formwork - roof","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"300","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"46","discipline_id":"2","activity_code":"BLD-310","activity_name":"Rebar - Roof Slab","description":"Slab reinforcement - roof","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"310","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"47","discipline_id":"2","activity_code":"BLD-320","activity_name":"Formwork - Roof Slab","description":"Slab formwork - roof","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"320","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"48","discipline_id":"2","activity_code":"BLD-330","activity_name":"Concrete Pouring - Roof Slab","description":"Slab concrete - roof","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"330","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"49","discipline_id":"2","activity_code":"BLD-340","activity_name":"Formwork Removal - Roof","description":"Formwork removal - roof","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"340","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"50","discipline_id":"2","activity_code":"BLD-350","activity_name":"Roof Waterproofing - Primer","description":"Waterproofing primer application","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"350","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"51","discipline_id":"2","activity_code":"BLD-360","activity_name":"Roof Waterproofing - Membrane","description":"Waterproofing membrane installation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"360","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"52","discipline_id":"2","activity_code":"BLD-370","activity_name":"Roof Waterproofing - Protection Layer","description":"Protective screed over waterproofing","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"370","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"53","discipline_id":"2","activity_code":"BLD-380","activity_name":"Blockwork - Ground Floor","description":"Masonry blockwork - ground floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"380","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"54","discipline_id":"2","activity_code":"BLD-390","activity_name":"Blockwork - 1st Floor","description":"Masonry blockwork - 1st floor","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"390","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"55","discipline_id":"2","activity_code":"BLD-400","activity_name":"Plastering - Internal","description":"Internal wall plastering","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"400","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"56","discipline_id":"2","activity_code":"BLD-410","activity_name":"Plastering - External","description":"External wall plastering","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"410","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"57","discipline_id":"2","activity_code":"BLD-420","activity_name":"Floor Tiling","description":"Floor tile installation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"420","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"58","discipline_id":"2","activity_code":"BLD-430","activity_name":"Wall Tiling","description":"Wall tile installation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"430","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"59","discipline_id":"2","activity_code":"BLD-440","activity_name":"Ceiling Installation","description":"False ceiling installation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"440","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"60","discipline_id":"2","activity_code":"BLD-450","activity_name":"Door Installation","description":"Door frames and leaves installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"450","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"61","discipline_id":"2","activity_code":"BLD-460","activity_name":"Window Installation","description":"Window frames and glazing","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"460","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"BLD","discipline_name":"Building"},{"activity_id":"1","discipline_id":"1","activity_code":"CIV-010","activity_name":"Site Clearing & Grubbing","description":"Clearing vegetation and site preparation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"10","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"2","discipline_id":"1","activity_code":"CIV-020","activity_name":"Excavation","description":"Bulk excavation and trenching works","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"20","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"3","discipline_id":"1","activity_code":"CIV-030","activity_name":"Lean Concrete","description":"Lean concrete blinding layer installation","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"30","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"4","discipline_id":"1","activity_code":"CIV-040","activity_name":"Rebar Installation - Foundation","description":"Reinforcement bar placement for foundations","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"40","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"5","discipline_id":"1","activity_code":"CIV-050","activity_name":"Formwork Installation - Foundation","description":"Formwork erection for foundation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"50","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"6","discipline_id":"1","activity_code":"CIV-060","activity_name":"Concrete Pouring - Foundation","description":"Mass concrete pouring for foundations","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"60","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"7","discipline_id":"1","activity_code":"CIV-070","activity_name":"Concrete Curing","description":"Concrete curing and protection","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"70","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"8","discipline_id":"1","activity_code":"CIV-080","activity_name":"Formwork Removal - Foundation","description":"Formwork stripping and cleaning","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"80","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"9","discipline_id":"1","activity_code":"CIV-090","activity_name":"Backfilling","description":"Trench and excavation backfilling","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"90","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"10","discipline_id":"1","activity_code":"CIV-100","activity_name":"Compaction","description":"Soil compaction and testing","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"100","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"11","discipline_id":"1","activity_code":"CIV-110","activity_name":"Sub-base Preparation","description":"Sub-base layer preparation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"110","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"12","discipline_id":"1","activity_code":"CIV-120","activity_name":"Base Course Installation","description":"Base course laying and compaction","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"120","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"13","discipline_id":"1","activity_code":"CIV-130","activity_name":"Road Pavement","description":"Asphalt or concrete pavement laying","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"130","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"14","discipline_id":"1","activity_code":"CIV-140","activity_name":"Drainage Works","description":"Storm water drainage installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"140","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"15","discipline_id":"1","activity_code":"CIV-150","activity_name":"Manholes & Chambers","description":"Construction of manholes and chambers","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"150","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"CIV","discipline_name":"Civil"},{"activity_id":"109","discipline_id":"5","activity_code":"ELE-010","activity_name":"Cable Tray Fabrication","description":"Cable tray manufacturing","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"10","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"110","discipline_id":"5","activity_code":"ELE-020","activity_name":"Cable Tray Installation","description":"Cable tray support and erection","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"20","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"111","discipline_id":"5","activity_code":"ELE-030","activity_name":"Conduit Installation","description":"Electrical conduit routing","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"30","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"112","discipline_id":"5","activity_code":"ELE-040","activity_name":"Conduit Underground","description":"Underground conduit installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"40","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"113","discipline_id":"5","activity_code":"ELE-050","activity_name":"Junction Box Installation","description":"JB mounting and termination","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"50","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"114","discipline_id":"5","activity_code":"ELE-060","activity_name":"Cable Pulling - Power","description":"Power cable installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"60","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"115","discipline_id":"5","activity_code":"ELE-070","activity_name":"Cable Pulling - Control","description":"Control cable installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"70","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"116","discipline_id":"5","activity_code":"ELE-080","activity_name":"Cable Termination - Power","description":"Power cable termination and lugging","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"80","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"117","discipline_id":"5","activity_code":"ELE-090","activity_name":"Cable Termination - Control","description":"Control cable termination","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"90","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"118","discipline_id":"5","activity_code":"ELE-100","activity_name":"Cable Gland Installation","description":"Cable gland fitting","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"100","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"119","discipline_id":"5","activity_code":"ELE-110","activity_name":"Cable Tagging & Labeling","description":"Cable identification tagging","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"110","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"120","discipline_id":"5","activity_code":"ELE-120","activity_name":"MV Switchgear Installation","description":"Medium voltage switchgear","unit_of_measure":"panel","typical_duration_days":null,"sequence_order":"120","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"121","discipline_id":"5","activity_code":"ELE-130","activity_name":"LV Switchgear Installation","description":"Low voltage switchgear\/MCC","unit_of_measure":"panel","typical_duration_days":null,"sequence_order":"130","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"122","discipline_id":"5","activity_code":"ELE-140","activity_name":"Transformer Installation","description":"Power transformer installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"140","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"123","discipline_id":"5","activity_code":"ELE-150","activity_name":"UPS Installation","description":"Uninterruptible power supply","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"150","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"124","discipline_id":"5","activity_code":"ELE-160","activity_name":"Battery Installation","description":"DC battery bank installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"160","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"125","discipline_id":"5","activity_code":"ELE-170","activity_name":"Generator Installation","description":"Diesel generator installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"170","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"126","discipline_id":"5","activity_code":"ELE-180","activity_name":"Motor Installation","description":"Electric motor mounting","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"180","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"127","discipline_id":"5","activity_code":"ELE-190","activity_name":"Motor Termination","description":"Motor cable termination","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"190","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"128","discipline_id":"5","activity_code":"ELE-200","activity_name":"Lighting Fixture Installation","description":"Light fixture mounting","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"200","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"129","discipline_id":"5","activity_code":"ELE-210","activity_name":"Grounding Grid Installation","description":"Earthing grid installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"210","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"130","discipline_id":"5","activity_code":"ELE-220","activity_name":"Lightning Protection","description":"Lightning arrester installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"220","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"131","discipline_id":"5","activity_code":"ELE-230","activity_name":"Continuity Testing","description":"Cable continuity check","unit_of_measure":"circuit","typical_duration_days":null,"sequence_order":"230","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"132","discipline_id":"5","activity_code":"ELE-240","activity_name":"Insulation Resistance Test","description":"Megger testing of cables","unit_of_measure":"circuit","typical_duration_days":null,"sequence_order":"240","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"133","discipline_id":"5","activity_code":"ELE-250","activity_name":"High Voltage (HV) Testing","description":"HV withstand testing","unit_of_measure":"circuit","typical_duration_days":null,"sequence_order":"250","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"134","discipline_id":"5","activity_code":"ELE-260","activity_name":"Loop Check Testing","description":"Control loop verification","unit_of_measure":"loop","typical_duration_days":null,"sequence_order":"260","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"135","discipline_id":"5","activity_code":"ELE-270","activity_name":"Energization & Commissioning","description":"System energization","unit_of_measure":"system","typical_duration_days":null,"sequence_order":"270","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ELE","discipline_name":"Electrical"},{"activity_id":"136","discipline_id":"6","activity_code":"INS-010","activity_name":"Instrument Cable Tray","description":"Instrument cable tray installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"10","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"137","discipline_id":"6","activity_code":"INS-020","activity_name":"Instrument Tubing Installation","description":"Impulse tubing installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"20","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"138","discipline_id":"6","activity_code":"INS-030","activity_name":"Instrument Air Tubing","description":"Instrument air distribution","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"30","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"139","discipline_id":"6","activity_code":"INS-040","activity_name":"Instrument Stand Installation","description":"Instrument support stand erection","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"40","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"140","discipline_id":"6","activity_code":"INS-050","activity_name":"Pressure Transmitter Installation","description":"PT mounting and connection","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"50","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"141","discipline_id":"6","activity_code":"INS-060","activity_name":"Temperature Transmitter Installation","description":"TT\/TE installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"60","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"142","discipline_id":"6","activity_code":"INS-070","activity_name":"Flow Transmitter Installation","description":"Flow meter installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"70","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"143","discipline_id":"6","activity_code":"INS-080","activity_name":"Level Transmitter Installation","description":"LT\/LG\/LSH installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"80","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"144","discipline_id":"6","activity_code":"INS-090","activity_name":"Analytical Instrument Installation","description":"Analyzer installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"90","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"145","discipline_id":"6","activity_code":"INS-100","activity_name":"Control Valve Installation","description":"Pneumatic\/electric control valve","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"100","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"146","discipline_id":"6","activity_code":"INS-110","activity_name":"On-Off Valve Installation","description":"Solenoid\/motorized valve","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"110","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"147","discipline_id":"6","activity_code":"INS-120","activity_name":"Safety Valve Installation","description":"PSV\/relief valve installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"120","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"148","discipline_id":"6","activity_code":"INS-130","activity_name":"Instrument Cable Pulling","description":"Instrument cable installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"130","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"149","discipline_id":"6","activity_code":"INS-140","activity_name":"Instrument Cable Termination - Field","description":"Field instrument termination","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"140","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"150","discipline_id":"6","activity_code":"INS-150","activity_name":"Instrument Cable Termination - Panel","description":"Panel side termination","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"150","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"151","discipline_id":"6","activity_code":"INS-160","activity_name":"Junction Box Wiring","description":"JB internal wiring","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"160","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"152","discipline_id":"6","activity_code":"INS-170","activity_name":"Marshalling Cabinet Installation","description":"MC installation and wiring","unit_of_measure":"panel","typical_duration_days":null,"sequence_order":"170","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"153","discipline_id":"6","activity_code":"INS-180","activity_name":"PLC Cabinet Installation","description":"PLC\/DCS cabinet installation","unit_of_measure":"panel","typical_duration_days":null,"sequence_order":"180","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"154","discipline_id":"6","activity_code":"INS-190","activity_name":"Panel Instrument Installation","description":"Panel-mounted instruments","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"190","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"155","discipline_id":"6","activity_code":"INS-200","activity_name":"Pneumatic Tubing Connection","description":"Instrument air connection","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"200","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"156","discipline_id":"6","activity_code":"INS-210","activity_name":"Instrument Loop Check","description":"Loop calibration and testing","unit_of_measure":"loop","typical_duration_days":null,"sequence_order":"210","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"157","discipline_id":"6","activity_code":"INS-220","activity_name":"Transmitter Calibration","description":"Field transmitter calibration","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"220","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"158","discipline_id":"6","activity_code":"INS-230","activity_name":"Control Valve Stroke Test","description":"Valve stroke and calibration","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"230","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"159","discipline_id":"6","activity_code":"INS-240","activity_name":"Safety System Testing","description":"ESD\/F&G system testing","unit_of_measure":"system","typical_duration_days":null,"sequence_order":"240","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"160","discipline_id":"6","activity_code":"INS-250","activity_name":"DCS\/PLC Programming","description":"Control system programming","unit_of_measure":"system","typical_duration_days":null,"sequence_order":"250","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"161","discipline_id":"6","activity_code":"INS-260","activity_name":"HMI Configuration","description":"Operator interface configuration","unit_of_measure":"system","typical_duration_days":null,"sequence_order":"260","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"INS","discipline_name":"Instrument"},{"activity_id":"181","discipline_id":"8","activity_code":"ISO-010","activity_name":"Insulation Material Preparation","description":"Material cutting and preparation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"10","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"182","discipline_id":"8","activity_code":"ISO-020","activity_name":"Hot Insulation - Piping","description":"Thermal insulation for hot piping","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"20","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"183","discipline_id":"8","activity_code":"ISO-030","activity_name":"Cold Insulation - Piping","description":"Cold\/chilled pipe insulation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"30","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"184","discipline_id":"8","activity_code":"ISO-040","activity_name":"Hot Insulation - Equipment","description":"Equipment thermal insulation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"40","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"185","discipline_id":"8","activity_code":"ISO-050","activity_name":"Cold Insulation - Equipment","description":"Equipment cold insulation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"50","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"186","discipline_id":"8","activity_code":"ISO-060","activity_name":"Insulation - Ductwork","description":"HVAC duct insulation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"60","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"187","discipline_id":"8","activity_code":"ISO-070","activity_name":"Vapor Barrier Installation","description":"Moisture barrier installation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"70","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"188","discipline_id":"8","activity_code":"ISO-080","activity_name":"Aluminum Cladding Installation","description":"Aluminum jacketing","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"80","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"189","discipline_id":"8","activity_code":"ISO-090","activity_name":"Stainless Steel Cladding","description":"SS cladding installation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"90","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"190","discipline_id":"8","activity_code":"ISO-100","activity_name":"PVC\/Polymeric Cladding","description":"Plastic protective cladding","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"100","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"191","discipline_id":"8","activity_code":"ISO-110","activity_name":"Insulation Band & Clip Installation","description":"Support band installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"110","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"192","discipline_id":"8","activity_code":"ISO-120","activity_name":"Insulation Sealing","description":"Joint sealing and weatherproofing","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"120","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"193","discipline_id":"8","activity_code":"ISO-130","activity_name":"Fire Protection Insulation","description":"Fire-resistant insulation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"130","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"194","discipline_id":"8","activity_code":"ISO-140","activity_name":"Acoustic Insulation","description":"Sound attenuation insulation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"140","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"195","discipline_id":"8","activity_code":"ISO-150","activity_name":"Personnel Protection Insulation","description":"Safety insulation for hot surfaces","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"150","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"196","discipline_id":"8","activity_code":"ISO-160","activity_name":"Removable Insulation Covers","description":"Insulation blanket installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"160","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"197","discipline_id":"8","activity_code":"ISO-170","activity_name":"Insulation Inspection & Testing","description":"Quality inspection of insulation","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"170","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"198","discipline_id":"8","activity_code":"ISO-180","activity_name":"Insulation Thickness Verification","description":"Thickness measurement","unit_of_measure":"point","typical_duration_days":null,"sequence_order":"180","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"ISO","discipline_name":"Insulation"},{"activity_id":"62","discipline_id":"3","activity_code":"MEC-010","activity_name":"Foundation Preparation - Equipment","description":"Equipment foundation preparation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"10","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"63","discipline_id":"3","activity_code":"MEC-020","activity_name":"Foundation Grouting","description":"Equipment base grouting","unit_of_measure":"cum","typical_duration_days":null,"sequence_order":"20","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"64","discipline_id":"3","activity_code":"MEC-030","activity_name":"Equipment Receiving & Inspection","description":"Equipment delivery inspection","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"30","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"65","discipline_id":"3","activity_code":"MEC-040","activity_name":"Equipment Rigging & Lifting","description":"Heavy equipment lifting operations","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"40","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"66","discipline_id":"3","activity_code":"MEC-050","activity_name":"Equipment Setting & Alignment","description":"Equipment positioning and alignment","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"50","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"67","discipline_id":"3","activity_code":"MEC-060","activity_name":"Anchor Bolt Installation","description":"Foundation anchor bolts installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"60","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"68","discipline_id":"3","activity_code":"MEC-070","activity_name":"Base Plate Installation","description":"Equipment base plate mounting","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"70","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"69","discipline_id":"3","activity_code":"MEC-080","activity_name":"Pump Installation","description":"Centrifugal\/positive displacement pumps","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"80","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"70","discipline_id":"3","activity_code":"MEC-090","activity_name":"Compressor Installation","description":"Air\/gas compressor installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"90","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"71","discipline_id":"3","activity_code":"MEC-100","activity_name":"Heat Exchanger Installation","description":"Shell & tube heat exchanger","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"100","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"72","discipline_id":"3","activity_code":"MEC-110","activity_name":"Pressure Vessel Installation","description":"Vertical\/horizontal pressure vessels","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"110","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"73","discipline_id":"3","activity_code":"MEC-120","activity_name":"Tank Installation","description":"Storage tank erection","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"120","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"74","discipline_id":"3","activity_code":"MEC-130","activity_name":"Fan Installation","description":"Industrial fan installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"130","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"75","discipline_id":"3","activity_code":"MEC-140","activity_name":"Valve Installation - Equipment","description":"Equipment valves installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"140","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"76","discipline_id":"3","activity_code":"MEC-150","activity_name":"Coupling Alignment","description":"Pump\/motor coupling alignment","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"150","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"77","discipline_id":"3","activity_code":"MEC-160","activity_name":"Vibration Pad Installation","description":"Anti-vibration mounting pads","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"160","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"78","discipline_id":"3","activity_code":"MEC-170","activity_name":"HVAC Duct Installation","description":"HVAC ductwork installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"170","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"79","discipline_id":"3","activity_code":"MEC-180","activity_name":"HVAC Unit Installation","description":"Air handling unit installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"180","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"80","discipline_id":"3","activity_code":"MEC-190","activity_name":"Chiller Installation","description":"Water chiller installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"190","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"81","discipline_id":"3","activity_code":"MEC-200","activity_name":"Cooling Tower Installation","description":"Cooling tower erection","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"200","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"82","discipline_id":"3","activity_code":"MEC-210","activity_name":"Boiler Installation","description":"Steam\/hot water boiler installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"210","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"83","discipline_id":"3","activity_code":"MEC-220","activity_name":"Equipment Pre-commissioning","description":"Mechanical run test preparation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"220","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"MEC","discipline_name":"Mechanical"},{"activity_id":"162","discipline_id":"7","activity_code":"PAI-010","activity_name":"Surface Preparation - Degreasing","description":"Surface cleaning and degreasing","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"10","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"163","discipline_id":"7","activity_code":"PAI-020","activity_name":"Surface Preparation - Hand Tool","description":"Manual surface preparation ST2\/ST3","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"20","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"164","discipline_id":"7","activity_code":"PAI-030","activity_name":"Surface Preparation - Power Tool","description":"Power tool cleaning PST2\/PST3","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"30","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"165","discipline_id":"7","activity_code":"PAI-040","activity_name":"Surface Preparation - Blast Cleaning","description":"Abrasive blasting Sa2.5\/Sa3","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"40","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"166","discipline_id":"7","activity_code":"PAI-050","activity_name":"Surface Profile Inspection","description":"Surface roughness verification","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"50","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"167","discipline_id":"7","activity_code":"PAI-060","activity_name":"Primer Application - Brush","description":"Brush application of primer","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"60","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"168","discipline_id":"7","activity_code":"PAI-070","activity_name":"Primer Application - Roller","description":"Roller application of primer","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"70","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"169","discipline_id":"7","activity_code":"PAI-080","activity_name":"Primer Application - Spray","description":"Spray application of primer","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"80","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"170","discipline_id":"7","activity_code":"PAI-090","activity_name":"Intermediate Coat Application","description":"Intermediate paint layer","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"90","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"171","discipline_id":"7","activity_code":"PAI-100","activity_name":"Finish Coat Application","description":"Final topcoat application","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"100","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"172","discipline_id":"7","activity_code":"PAI-110","activity_name":"Anti-Corrosion Coating","description":"Special protective coating","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"110","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"173","discipline_id":"7","activity_code":"PAI-120","activity_name":"Heat Resistant Coating","description":"High-temperature paint system","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"120","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"174","discipline_id":"7","activity_code":"PAI-130","activity_name":"Galvanizing Touch-up","description":"Cold galvanizing repair","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"130","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"175","discipline_id":"7","activity_code":"PAI-140","activity_name":"Stripe Coating","description":"Edge and weld stripe coat","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"140","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"176","discipline_id":"7","activity_code":"PAI-150","activity_name":"Paint Thickness Inspection","description":"DFT measurement and verification","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"150","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"177","discipline_id":"7","activity_code":"PAI-160","activity_name":"Holiday Detection Test","description":"Coating continuity inspection","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"160","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"178","discipline_id":"7","activity_code":"PAI-170","activity_name":"Paint Defect Repair","description":"Touch-up and repair work","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"170","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"179","discipline_id":"7","activity_code":"PAI-180","activity_name":"Color Coding - Piping","description":"Pipe identification painting","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"180","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"180","discipline_id":"7","activity_code":"PAI-190","activity_name":"Stenciling & Marking","description":"Equipment marking and signage","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"190","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PAI","discipline_name":"Painting"},{"activity_id":"84","discipline_id":"4","activity_code":"PIP-010","activity_name":"Pipe Support Fabrication","description":"Pipe support steel fabrication","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"10","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"85","discipline_id":"4","activity_code":"PIP-020","activity_name":"Pipe Support Installation","description":"Pipe support erection and welding","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"20","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"86","discipline_id":"4","activity_code":"PIP-030","activity_name":"Pipe Spool Fabrication","description":"Workshop pipe spool fabrication","unit_of_measure":"inch-dia","typical_duration_days":null,"sequence_order":"30","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"87","discipline_id":"4","activity_code":"PIP-040","activity_name":"Pipe Spool Painting - Shop","description":"Shop primer\/finish coat application","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"40","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"88","discipline_id":"4","activity_code":"PIP-050","activity_name":"Pipe Material Receiving","description":"Pipe and fitting material receipt","unit_of_measure":"ton","typical_duration_days":null,"sequence_order":"50","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"89","discipline_id":"4","activity_code":"PIP-060","activity_name":"Pipe Cutting & Beveling","description":"Pipe preparation for welding","unit_of_measure":"inch-dia","typical_duration_days":null,"sequence_order":"60","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"90","discipline_id":"4","activity_code":"PIP-070","activity_name":"Pipe Fit-up & Tack Welding","description":"Pipe alignment and tack welding","unit_of_measure":"inch-dia","typical_duration_days":null,"sequence_order":"70","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"91","discipline_id":"4","activity_code":"PIP-080","activity_name":"Pipe Welding - Carbon Steel","description":"CS pipe welding execution","unit_of_measure":"inch-dia","typical_duration_days":null,"sequence_order":"80","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"92","discipline_id":"4","activity_code":"PIP-090","activity_name":"Pipe Welding - Stainless Steel","description":"SS pipe welding execution","unit_of_measure":"inch-dia","typical_duration_days":null,"sequence_order":"90","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"93","discipline_id":"4","activity_code":"PIP-100","activity_name":"Pipe Welding - Alloy Steel","description":"Alloy pipe welding execution","unit_of_measure":"inch-dia","typical_duration_days":null,"sequence_order":"100","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"94","discipline_id":"4","activity_code":"PIP-110","activity_name":"Weld Visual Inspection","description":"Visual weld quality inspection","unit_of_measure":"weld","typical_duration_days":null,"sequence_order":"110","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"95","discipline_id":"4","activity_code":"PIP-120","activity_name":"Weld Radiography (RT)","description":"Radiographic weld examination","unit_of_measure":"weld","typical_duration_days":null,"sequence_order":"120","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"96","discipline_id":"4","activity_code":"PIP-130","activity_name":"Weld Ultrasonic Testing (UT)","description":"Ultrasonic weld examination","unit_of_measure":"weld","typical_duration_days":null,"sequence_order":"130","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"97","discipline_id":"4","activity_code":"PIP-140","activity_name":"Weld Repair","description":"Defective weld repair and re-test","unit_of_measure":"weld","typical_duration_days":null,"sequence_order":"140","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"98","discipline_id":"4","activity_code":"PIP-150","activity_name":"Valve Installation - Process","description":"Process valve installation","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"150","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"99","discipline_id":"4","activity_code":"PIP-160","activity_name":"Flange Bolt-up","description":"Flange assembly and torquing","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"160","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"100","discipline_id":"4","activity_code":"PIP-170","activity_name":"Pipe Installation - Underground","description":"Underground piping installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"170","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"101","discipline_id":"4","activity_code":"PIP-180","activity_name":"Pipe Installation - Aboveground","description":"Aboveground piping installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"180","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"102","discipline_id":"4","activity_code":"PIP-190","activity_name":"Pipe Installation - Rack","description":"Pipe rack piping installation","unit_of_measure":"lm","typical_duration_days":null,"sequence_order":"190","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"103","discipline_id":"4","activity_code":"PIP-200","activity_name":"Specialty Item Installation","description":"Strainers, traps, flex hoses","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"200","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"104","discipline_id":"4","activity_code":"PIP-210","activity_name":"Pipe Hydrostatic Testing","description":"Pressure testing with water","unit_of_measure":"system","typical_duration_days":null,"sequence_order":"210","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"105","discipline_id":"4","activity_code":"PIP-220","activity_name":"Pipe Pneumatic Testing","description":"Pressure testing with air\/nitrogen","unit_of_measure":"system","typical_duration_days":null,"sequence_order":"220","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"106","discipline_id":"4","activity_code":"PIP-230","activity_name":"Leak Repair - Pressure Test","description":"Leak repair after pressure test","unit_of_measure":"nos","typical_duration_days":null,"sequence_order":"230","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"107","discipline_id":"4","activity_code":"PIP-240","activity_name":"Pipe Flushing & Cleaning","description":"Internal pipe cleaning","unit_of_measure":"system","typical_duration_days":null,"sequence_order":"240","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"},{"activity_id":"108","discipline_id":"4","activity_code":"PIP-250","activity_name":"Pipe Painting - Field","description":"Field touch-up painting","unit_of_measure":"sqm","typical_duration_days":null,"sequence_order":"250","is_active":"1","created_at":"2025-12-08 07:57:57","discipline_code":"PIP","discipline_name":"Piping"}]